Athletes
Route variation
Standard route
Multi-sport
No
Gender category
Male
Style
Unsupported
Finish date
Total time
3h
56m
36s
GPS track(s)
Kissing-Bridge-Scott.gpx4.95 MB
Report
Standard route, east-to-west from Guelph to Millbank, including a detour through the Kissing Bridge and another one in Wallenstein at the Conostogo River.
This was my first time on the Kissing Bridge Trailway, although I have been through the covered bridge a couple times before. There was a lot of snow and ice still on the trail, but nothing too hazardous. Lots of mud near the end as well. I would like to make another attempt in warmer weather, but for now I am happy with my result.
Props to Luke Hoyt for getting the FKT ball rolling and for managing to establish his time in such foul weather.
Video: https://www.instagram.com/p/BvZxSIQBTBs/?utm_source=ig_share_sheet&igshid=144ksx7sdgeiw