FKT: Taton Bertsch - Twin Valley Trail (OH) - 2025-10-16

Athletes
Route variation
Standard route
Multi-sport
No
Para athlete
No
Gender category
Male
Style
Unsupported
Start date
Finish date
Total time
3h 24m 54s
Report

On 10/16/2025, at 1145am, I attempted the Twin Valley Trail FKT.  I chose to go counterclockwise.  I had a great time out on the trail!  It was my 2nd time running the TVT.  It was a beautiful fall day.  The trail conditions were amazing.  I had some cramping toward the end and fell once.  I carried two handhelds with some gels and Pinole cookies in a waist pack.  I did not carry my phone.  The pictures I took were from the trail head at the Germantown Sledhill parking lot, where I started and finished the route.

The TVT connector trail (between Germantown Metropark and the bike trail) is one of my favorite sections of this route.  I would say it’s both the hardest and most scenic section of the route.

“Unique fatigue”
The TVT is a fast route.  It is challenging in a special way because it takes being able to efficiently change gears.  There are lots of flat stretches you’ll want to crank on like a road marathoner, but there’s many steep hills to conquer at the Metroparks.  It’s a unique fatigue you get toward the end.  

After the run, I cleaned up with some wet wipes, put on my uniform, then went to work.  

Taton Bertsch