The Circle Line (CCL) is a fully underground, 39.5-kilometre medium-capacity MRT line in Singapore. With the opening of Stage 6 (Keppel, Cantonment, and Prince Edward Road) on July 12, 2026, the Circle Line officially closed the gap between HarbourFront and Marina Bay, completing a continuous closed loop.
This FKT route starts at Dhoby Ghaut (CC1) and passes through all 33 operational stations anticlockwise through Bayfront (CC34) from Bayfront it connects back at Promenade (CC4) before returning back to CC1. This creates a fully closed loop of 50km in both directions. Selfies with station sign are not mandatory, but highly recommended.